Completion of the new gym is on schedule

View toward the upper lakeView toward the upper lake

Shortly after the last camper headed down the camp road, the crane arrived to hoist the steel into place. Now that the infrastructure is complete, the floor joists for the basketball court are being installed. The rock masons have begun work on the chimney, and the turf has been ordered for the indoor soccer field on the lower level. We are thrilled with the progress and can’t wait for campers to enjoy it next summer. We will continue to add photos of the construction on our website.

The crane set the steel framing and the large wooden timbers that hold up the 12’ wide wrap around porchThe crane set the steel framing and the large wooden timbers that hold up the 12’ wide wrap around porch

Laying out the joists for the future wooden gym floorLaying out the joists for the future wooden gym floor

Gym 4

View from the upper lake road near the rope swingView from the upper lake road near the rope swing

The lower level will house a new ‘indoor field’ complete with walls and artificial grassThe lower level will house a new ‘indoor field’ complete with walls and artificial grass

Gym 7